No
|
Uraian
|
Kode
|
Satuan
|
Koef.
| Harga Satuan | Jumlah Harga |
Rp | Rp | |||||
A | TENAGA | |||||
Pekerja | L.01 | OH | 0.400 | 0.00 | ||
Tukang kayu | L.02 | OH | 0.200 | 0.00 | ||
Kepala tukang | L.03 | OH | 0.020 | 0.00 | ||
Mandor | L.04 | OH | 0.020 | 0.00 | ||
TOTAL UPAH TENAGA | 0.00 | |||||
B | BAHAN | |||||
Dolken kayu Ø 8 -10 / 400 cm | Batang | 1.250 | 0.00 | |||
Semen portland | Kg | 5.000 | 0.00 | |||
Pasir beton | m3 | 0.005 | 0.00 | |||
Kayu 5/7 | m3 | 0.009 | 0.00 | |||
Paku biasa 2"-5" | Kg | 0.072 | 0.00 | |||
Residu | Liter | 0.400 | 0.00 | |||
TOTAL BIAYA BAHAN | 0.00 | |||||
C | PERALATAN | |||||
0.00 | ||||||
0.00 | ||||||
TOTAL BIAYA PERALATAN | 0.00 | |||||
D | Total upah tenaga, biaya material dan peralatan | (A + B + C) | 0.00 | |||
E | Overhead + profit | 15 | % x D | 0.00 | ||
F | Harga satuan pekerjaan | (D + E) | 0.00 |